The Former Porcupine Pub, Mottingham

Location
Mottingham
Client
Tinelly Construction

The Porcupine Pub Pre-Demolition

Last orders have officially been called for the Porcupine Pub, Mottingham!

 

After being derelict for a number of years it was time to make way for a new Lidl flagship store which will be multi-level and include a bakery.

Working alongside Tinelly Construction, we were able to effectively provide a new lease of life for the site. Environmental monitoring was installed pre-demolition to ensure the dust, noise and vibration levels were kept to a minimum. With full demolition and site clearance complete, the groundworks for the construction phase were well on their way.

 

 

 

 

The scope of works included:

Asbestos Removal

Pre-Demolition site clearance and fly tip waste removal

Set-up and installation of environmental monitoring

Demolition of the pub’s main building, including a number of smaller outbuildings

Removal of basement and foundations

Backfilling and compaction testing

Removal of tarmac car park

Installation of Hoarding and gates ready for the project’s construction phase

 

 The Final Result:

 

 

 

 

 

 

 

Latest News

Demolition Thornbrook House

Hitachi 350LC going about its demolition business with ease Photo shot of the Hitachi Zaxis 350LC demolishing Thornbrook house on behalf of Tilia homes. Made short work of the demolition, ground slabs and foundation removals. Moved onto crushing with the aid of a Zaxis 290.

WINNER

Correct weight was 1.38t Leesa had the closest guess to that. Thank you to all who participated.

Kent Construction expo

Our first time exhibiting at the Kent Construction Expo at the county show grounds Detling. Very successful event and really good to meet so many familiar faces and to make some new contacts. Very well staged event.

Latest Case Study

87 Blackwall Lane

87 Blackwall Lane

Demolition, Asbestos R&D Survey, temporary works, remediation, contaminated soil removal, tarmac removal/disposal.