Thames Water

Project
Beddington Digesters
Project Location
Beddington, Croydon, Surrey
Type of Demolition
Cold Cutting and Machine Demolition
Recycling Rate
100%

Description of Project

We were required to remove the roof of 3no digester tanks on Thames Water Beddington Sewage Treatment Works.

Hot cutting techniques were not permitted  because of the nature of the site which meant all three digesters had to be cold cut. Once the crown was cut the high reach could remove the sheets and demolish the umbrella structure.

Scope Of Works

  • Cold Cutting the crown
  • Removal of the Umbrella
  • Removal of the Walkway

Latest News

Demolition Thornbrook House

Hitachi 350LC going about its demolition business with ease Photo shot of the Hitachi Zaxis 350LC demolishing Thornbrook house on behalf of Tilia homes. Made short work of the demolition, ground slabs and foundation removals. Moved onto crushing with the aid of a Zaxis 290.

WINNER

Correct weight was 1.38t Leesa had the closest guess to that. Thank you to all who participated.

Kent Construction expo

Our first time exhibiting at the Kent Construction Expo at the county show grounds Detling. Very successful event and really good to meet so many familiar faces and to make some new contacts. Very well staged event.

Latest Case Study

87 Blackwall Lane

87 Blackwall Lane

Demolition, Asbestos R&D Survey, temporary works, remediation, contaminated soil removal, tarmac removal/disposal.