SGN

Project
Canterbury Gas Holder
Project Location
Canterbury, Kent
Type of Demolition
Floor by Floor Dismantling
Recycling Rate
100%

Description of Project

We were required to demolish the Wiggins gas holder on Southern Gas Networks Canterbury site. Unlike the normal gas holders the Wiggins type gas holders are water less and retain the gas by using a rubber diaphragm.

Due to the close proximity of the railway line and neighbouring industrial estate we were required to fully enclose the holder using scaffold and dismantle the holder using hot cutting techniques.

Scope of Works

  • Ground consolidation
  • Scaffolding
  • Removal of internal rubber diaphragm
  • Level by Level Dismantling using hot cutting techniques
  • Ground slab removal
  • Leveling of the site
  • Recycling

Latest Case Study

Dreadnought, Greenwich

Dreadnought

The project consisted of the demolition of the central courtyard 2 storey glazed structure and the asbestos removal to the basement of the listed Dreadnought building. The Dreadnought building was originally constructed (1764-68) by Greenwich Hospital as its infirmary for treating sick Greenwich Pensioners. The central corridor connecting the two wings contained historical items including … Continue reading