Highshore School

Location
London
Client
Galliford Try

The scope of works detailed soft strip demolition, asbestos removal, and structural demolition of the
brick/masonry building down to ground level.

The works also involved below ground demolition to remove the ground floor slab, foundations, and any below ground obstructions, before the excavation was backfilled and to an even civilised level.

Latest News

Demolition Thornbrook House

Hitachi 350LC going about its demolition business with ease Photo shot of the Hitachi Zaxis 350LC demolishing Thornbrook house on behalf of Tilia homes. Made short work of the demolition, ground slabs and foundation removals. Moved onto crushing with the aid of a Zaxis 290.

WINNER

Correct weight was 1.38t Leesa had the closest guess to that. Thank you to all who participated.

Kent Construction expo

Our first time exhibiting at the Kent Construction Expo at the county show grounds Detling. Very successful event and really good to meet so many familiar faces and to make some new contacts. Very well staged event.

Latest Case Study

87 Blackwall Lane

87 Blackwall Lane

Demolition, Asbestos R&D Survey, temporary works, remediation, contaminated soil removal, tarmac removal/disposal.