Environmental

From inception to completion consideration must be given to the environment and the effect SBS activities will have on it. Measures taken by SBS to reduce the impact on the environment include:

  • Creation of an Environmental Management Plan
  • Waste minimisation and recycling
  • Environmental Monitoring; Dust, Noise and Vibration
  • Dust mitigation
  • Noise and vibration abatement
  • Sediment and erosion controls

Latest Case Study

Dreadnought, Greenwich

Dreadnought

The project consisted of the demolition of the central courtyard 2 storey glazed structure and the asbestos removal to the basement of the listed Dreadnought building. The Dreadnought building was originally constructed (1764-68) by Greenwich Hospital as its infirmary for treating sick Greenwich Pensioners. The central corridor connecting the two wings contained historical items including … Continue reading