Dog Kennel Hill Primary School

Project
Southwark Council
Project Location
Dog Kennel Hill, East Dulwich
Project Duration
3 Weeks
Type of Demolition
Hand & Machine Demolition

Description of Project

Dog Kennel Hill Primary School required the annexe building to be demolished to make way for a landscape garden, including a pond and decking area.

This would enable the children to learn about the habitats of the different kind of species in a pond environment.

Scope of Works

  • Tree and bush removal to enable demolition
  • Demolition of 2 storey annexe building with slabs and foundations
  • Excavation of hard standing
  • Backfilling using crushed hardcore back to ground level
  • Excavation of a new pond
  • Waste disposal

Methodology

  • Full scaffold to all elevations of the annexe building to enable hand demolition
  • Soft strip of internal furnishings, floor and ceiling coverings
  • Hand demolition from the roof down to 1st floor level to enable machine demolition
  • Machine demolition using a 9 tonne excavator with a pulveriser attachment to reduce the building down to ground floor level
  • Removal of slab and foundations using a 9 tonne excavator with a breaker attachment

Latest News

Demolition Thornbrook House

Hitachi 350LC going about its demolition business with ease Photo shot of the Hitachi Zaxis 350LC demolishing Thornbrook house on behalf of Tilia homes. Made short work of the demolition, ground slabs and foundation removals. Moved onto crushing with the aid of a Zaxis 290.

WINNER

Correct weight was 1.38t Leesa had the closest guess to that. Thank you to all who participated.

Kent Construction expo

Our first time exhibiting at the Kent Construction Expo at the county show grounds Detling. Very successful event and really good to meet so many familiar faces and to make some new contacts. Very well staged event.

Latest Case Study

87 Blackwall Lane

87 Blackwall Lane

Demolition, Asbestos R&D Survey, temporary works, remediation, contaminated soil removal, tarmac removal/disposal.